Sealcoating & Crack Sealing
Sealcoating and crack sealing that protect your investment
Florida sun and rain break asphalt down fast. Sealcoating and crack sealing slow that damage, restore a deep-black finish and set the stage for crisp new striping.

- Licensed & InsuredCoverage on every job
- Free EstimatesClear, itemized quotes
- Night & Weekend WorkZero disruption to your business
- Bilingual TeamWe speak English & Spanish
- All of FloridaBased in Haines City
What is sealcoating & crack sealing?
Sealcoating is a protective coating applied over asphalt to shield it from UV rays, water and automotive fluids, while crack sealing fills cracks with a flexible rubberized sealant to keep water out of the pavement base. Together they extend the life of a parking lot and give a fresh, deep-black surface for new striping.
What's included
- Surface cleaning & prepDebris, dirt and loose material removed before sealing.
- Hot-pour crack sealingFlexible rubberized sealant that keeps water out of cracks.
- Commercial sealcoatingEven coats for a uniform, deep-black protective finish.
- UV & water protectionSlows oxidation and moisture damage from Florida weather.
- Planned cure timesSections closed and reopened on a clear schedule.
- Restriping after sealingFresh lines on fresh pavement, in one coordinated project.
How it works
How a sealcoating project works
Inspect & plan
We assess the pavement, mark cracks and plan sections around your traffic.
Clean & crack seal
We clean the surface and fill cracks with hot-pour sealant.
Sealcoat
Even coats of sealer are applied and left to cure on schedule.
Restripe & reopen
We restripe stalls, arrows and markings, then reopen the lot.
Visiona
Why sealing is the smartest maintenance
Longer pavement life
Sealing slows the oxidation and water damage that turn small cracks into potholes.
Like-new appearance
A uniform black surface makes the whole property look refreshed.
Lower long-term cost
Routine sealing costs far less than major asphalt repair or replacement.


FAQ
Questions property managers ask us
Straight answers about striping, compliance and scheduling. Don't see your question? Call us at (863) 563-1538.
How often should a parking lot be sealcoated?
Most commercial asphalt lots benefit from sealcoating every two to three years. Florida's strong sun and frequent rain oxidize asphalt quickly, so regular sealing helps prevent surface wear and cracking.
How long before we can drive on a sealcoated lot?
Sealcoat typically needs about 24 to 48 hours to cure before vehicle traffic, depending on temperature, humidity and shade. We plan sections so you can keep parts of the lot open.
What is the difference between crack sealing and crack filling?
Crack sealing uses a flexible, hot-applied rubberized sealant designed to move with the pavement and keep water out, while crack filling uses less flexible material for more stable cracks. We recommend the right method after inspecting your lot.
Do you restripe after sealcoating?
Yes. Sealcoating covers existing lines, so we restripe the lot after the sealer cures, giving you a fresh surface and crisp new markings in one project.
Related services
Ready for sharper, safer lines?
Tell us about your property and get a free, itemized estimate. We usually respond within one business day.


